ZS1NEV and ZS1MJT left for site at 08h00.
It was a cool day, and wind was blowing with clear skies.
Today’s task was to install the controller and link radios and test accordingly.
We installed the controller and radios and did some testing. SWR was still good 1.2:1.
Link to Hanskop was working 100%, but we hit a snag with the link to Riversdal. Further testing that side meant we had to change settings on that radio. Unfortunately, we could not do this on site and brought that radio back with us for configuration.
The link to Hanskop was left on.
We arrived home about 17h00.
ZS1MJT