Maintenance George 2021-09-11

On Saturday 11 September, Francois ZS1Q visited the George 145.700 repeater site. Francois found the hut had been equipped with a new gate to upgrade the security of the equipment room.

Francois checked and topped up the water in the backup battery bank and reports that the site is still in good order.