Maintenance Hanskop 2016-05-17

It was an early start 05:45 in Stellenbosch.  06:10 Somerset Wes. 06:30 Strand.

ZS1VDV, ZS1V and ZS1YT were on site at 07:30.

Moved temporary brackets further apart to stabilize new 6m galvanized pole.
Stays were added.
Mast groundwire added.
Antennas moved further apart.
All seals were redone in dry weather.
Cable tray was reinstalled.
VHF repeater SWR 1.1, UHF repeater SWR 1.2 and Jonaskop Link Radio SWR 1.7.
New power supply installed (Donated by ZS1K).
UHF repeater and Jonaskop Link Radio is connected to new power supply.
VHF repeater connected to Nova power supply.

Collapsed tower visible on the left. WCRWG temporary installation visible on the far side of the building with Jonaskop link beam at the top.

Collapsed tower visible on the left. WCRWG temporary installation visible on the far side of the building with Jonaskop link beam at the top.

Default linking moved to all linked.
DTMF updated to measure 2 power supplies.