Jan ZS1VDV and JP ZS1JPM, serviced Hawequa charger circuit.
Left Stellenbosch 17:15
On Site 18:15
Found a fuse holder failure.
Removed failed fuse
Replaced wire between fuse box and charger
Left site 19:30
Home 20:30
Jan ZS1VDV and JP ZS1JPM, serviced Hawequa charger circuit.
Left Stellenbosch 17:15
On Site 18:15
Found a fuse holder failure.
Removed failed fuse
Replaced wire between fuse box and charger
Left site 19:30
Home 20:30
For your reading pleasure.
Here for your reading pleasure.
Thanks to Eskom’s load-shedding last night, finalisation and issuing of the report was overlooked. Here it is now.
Almost the middle of the month… and a brand new report for your reading pleasure.
First of the month of August.
This is the last one for this month, enjoy 🙂
The latest and … well, maybe not greatest but it’s still for your reading pleasure.
Matt ZS1MTF, JP ZS1JPM and Jan ZS1VDV investigated the power outage at Jonaskop. The sun was out, some wind was blowing and some left over snow was visible.
An upstream Eskom breaker was reset.
With the storms, the hut took a bit of a beating. The one air vent cover needed to be replaced and the outside temperature sensor wire repaired.
The backup battery distribution was upgrade and fuses installed. The site is now ready to take an easy install of 2 more batteries.
Matt ZS1MTF and Jan ZS1VDV investigated the UHF repeater on Hanskop.
It was found to be in working order. The SQL level of the UHF repeater was measured at 0.43uV.